No. | Job Title | Scope Of Work | Client |
---|---|---|---|
1 | Engineering, Procurement Construction and Commissioning (EPCC) of Natural Gas Distribution to Rasa FL Stage 1/24, Rasa Industrial Area, Rasa, Selangor Darul Ehsan (Package I) | 11,532m of 400mm & 72m of 200mm of Pipeline Repair Work | Gas Malaysia Distribution Sdn Bhd |
2 | Engineering, Procurement Construction and Commissioning (EPCC) of Natural Gas Distribution to Tangga Batu FL Stage 1/24, Tangga Batu, Melaka (Tangga Batu Reinforcement) | 3,804m of 400mm & 6m of 200mm of Pipeline Repair Work | Gas Malaysia Distribution Sdn Bhd |
3 | Engineering, Procurement Construction and Commissioning (EPCC) of Natural Gas Distribution to Pasir Gudang FL Stage 1/24, Pasir Gudang, Johor | 5,520m of 400mm of Pipeline Repair Work | Gas Malaysia Distribution Sdn Bhd |
4 | Engineering, Procurement Construction and Commissioning (EPCC) of The Gas Pipeline Relocation Works at Project Menaiktaraf Jalan Perindustrian Rawang (FT3209) dalam Daerah Gombak, Selangor Darul Ehsan | 1,615m of 400mm & 35m of 100mm of Pipeline Repair Work | Gas Malaysia Distribution Sdn Bhd |
5 | Engineering, Procurement and Construction (EPC) of Pipeline Protection for Takungan Air Pingiran Sungai Project (TAPS) for Petronas Gas Berhad | 700m of 450mm & 700mm of Pipeline Repair Work | Petronas Gas Berhad |
6 | Engineering, Procurement, Construction and Commissioning of Natural Gas Distribution System to Kamunting FL Stage 2/23, Kamaunting Perak Darul Ridzuan (Kamunting Reinforcement) | 2,520m of 400mm & 6m of 200mm of Gas Pipeline Work | Gas Malaysia Distribution Sdn Bhd |
7 | Engineering, Procurement and Construction (EPC) of Underground Nitrogen Gas Pipeline at Senawang, Negeri Sembilan (Onsemi Project) | 6,208m of 200mm, 305m of 150mm & 222m of 100mm of Gas Pipeline Work | Linde Engineering Malaysia Sdn Bhd |
8 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Simpang Ampat FL Stage 2/23, Simpang Ampat, Pulau Pinang | 1,578m of 200mm & 48m of 100mm of Gas Pipeline Work | Gas Malaysia Distribution Sdn Bhd |
9 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Sungai Bakap FL Stage 1/23, Sungai Bakap, Pulau Pinang | 1,116m of 200mm & 36m of 100mm of Gas Pipeline Work | Gas Malaysia Distribution Sdn Bhd |
10 | Underground Gaseous Nitrogen Pipeline from Linde Site to TF AMD Microelectrinics in Batu Kawan Industrial Park, Pulau Pinang | 3.54km of 250mm & 0.48km of 200mm of Gas Pipeline Work | Linde Malaysia Sdn Bhd |
11 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Sungai Bakap FL Stage 2/22, Sungai Bakap, Pulau Pinang | 48m of 100mm & 1,020m of 150mm of Gas Pipeline Work | Gas Malaysia Distribution Sdn Bhd |
12 | Engineering & Construction of TF AMD & AVX Underground Pipeline at Bayan Lepas, Penang | 704m of 200mm of Underground Pipeline | Linde Malaysia Sdn Bhd |
13 | Engineering, Procurement, Construction and Commissioning (EPCC) of Odoriser Station Upgrading Phase 1/22, Kulim Kedah | 50m of 200mm Odoriser Station | Gas Malaysia Distribution Sdn Bhd |
14 | BR-NEG Underground GOX Pipeline Rerouting near Sg Rasah for JPS | Underground GOX Pipeline | Linde Malaysia Sdn Bhd |
15 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Sungai Bakap FL Stage 1/21, Sungai Bakap, Pulau Pinang | 2,064m of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
16 | Construction and Completion of Guideway Station, Park and Ride Ancillary Buildings and Other Associated Works for Package GS10 for Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia (Package GS10) | Relocation of 200mm ND Carbon Steel Gas Pipes | Sri Jadi Construction |
17 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Kinta Valley FL Stage 1/21, Bercham, Tasek & Meru Industrial Area, Ipoh, Perak Darul Ridzuan | 120m of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
18 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Kinta Valley FL Stage 2/21, Chemor Ceramic Park, Ipoh Perak Darul Ridzuan | 630m of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
19 | The Engineering, Procurement, Construction and Commissioning (EPCC) of Pipeline Replacement and Repair Works at PDB Prai Terminal | Pipeline Replacement & Repair Works | Petronas Dagangan Berhad |
20 | Protection for Pipeline Works at Damansara Perdana | Protection for Pipeline Works | Nestcon Infra Sdn Bhd |
21 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Bandar Sunway FL Stage 1/20, Bandar Sunway, Selangor Darul Ehsan | 1,176m of 200mm and 150m of 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
22 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Kuala Langat FL Stage 1/20, Kuala Langat, Selangor Darul Ehsan | 2,832m of 400mm and 200mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
23 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Damansara FL Stage 1/20, Damansara, Kuala Lumpur, Pavilion Damansara I & Pavilion Damansara II | 984m of 150mm and 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
24 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Meru FL Stage 1/20, Klang, Selangor Darul Ehsan | 204m of 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
25 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Kinta Valley FL Stage 2/20, Bemban Industrial Estate & Pengkalan II Industrial Estate, Perak Darul Ridzuan | 1,032m of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
26 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Sedenak FL Stage 1/20, Kulai, Johor Darul Takzim | 6,648m of 200mm and 150mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
27 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Bangi FL Stage 1/20, Bangi Industrial Area, Bangi, Selangor Darul Ehsan | 444m of 150mm and 100mm Gas Pipeline Works | Gas Malaysia Distribution Sdn Bhd |
28 | Engineering, Procurement, Construction and Commissioning (EPCC) of Jet-A1 Underground Pipeline Replacement and Other Associated Works at KLIA 2 Q16 Aircraft Parking Bay | Pipeline Replacement Works | Kuala Lumpur Aviation Fuelling System & Nippon Road (M) Sdn Bhd |
29 | Relocation and Reinstatement of Existing Gas Pipelines at KLCC East Station | 403m of 200mm and 100mm Gas Pipeline Works | Gamuda Engineering Sdn Bhd |
30 | Engineering, Approvals, Supply, Contraction, Installation, Testing & Commissioning Support Services for Underground Gaseous Oxygen Pipeline from Linde Pasir Gudang to Knauf Insulation in Tanjung Langsat, Johor | 9.1km of 200mm Oxygen Gas Pipeline Works | Linde Malaysia Sdn Bhd |
31 | To Supply, Delivery, Installation for Carbon Dioxide Pipeline Works at Ace Gases CO2 Plant, Kerteh, Terengganu | 474m of 450mm Carbon Dioxide Pipeline Works | Kelington Technologies Sdn Bhd |
32 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Pulau Indah FL Stage 3/18, Pulau Indah, Klang, Selangor Darul Ehsan | 1,356m of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Berhad |
33 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Cheng FL Stage 1/18, Cheng, Melaka | 4,152m of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Berhad |
34 | Engineering, Procurement, Construction and Commissioning (EPCC) of the Natural Gas Distribution System to Lipat Kajang FL Stage 1/17, Elkay Industrial Area, Lipat Kajang, Jasin, Melaka | 16,485m of 300mm and 77m of 200mm Gas Pipeline Works | Gas Malaysia Berhad |
35 | Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Liquified Petroleum Gas (LPG) Services for Complex Hotel 33 Floor (2 Buildings) which Connect to Complex Hotel First World, Genting Highlands, Bentong, Pahang | LPG Gas Piping Installation | Genting Malaysia Berhad & KTA Tenaga Sdn Bhd |
36 | Relocation and Reinstatement of Existing Gas Pipelines at KLCC East Station | Gas Pipeline Relocation Works | Gamuda Engineering Sdn Bhd |
37 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Balakong FL DL Stage 1/18, Balakong, Selangor | 1,734m of 150mm and 123m of 100mm Gas Pipeline Works | Gas Malaysia Berhad |
38 | The Relocation of Existing Gas Pipeline at Sentul West Station | Gas Pipeline Relocation Works | MMC Gamuda KVMRT (UGW) Joint Venture |
39 | Gas Pipe Permanent Reinstatement at Sentul Station | Gas Pipeline Reinstatement Works | MMC Gamuda KVMRT (UGW) Joint Venture |
40 | Relocation and Reinstatement Works for Gas Pipeline for Proposed Construction and Completion of Traffic Improvement including Tunnels and Associated Works at Persiaran KLCC/ Lorong Kuda Intersection & Lorong Kuda, Kuala Lumpur City Centre | Gas Pipeline Relocation Works | BSG Construction (Malaysia) Sdn Bhd |
41 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Bandar Sultan Suleiman FL Stage 1/18, Bandar Sultan Suleiman Industrial Area, Port Klang, Selangor | 1,797km of 200mm and 100mm Gas Pipeline Works | Gas Malaysia Berhad |
42 | Melaka Infineon Nitrogen Plant Relocation & Revamp Project - Underground Gaseous Nitrogen Pipeline Works | 1km of Nitrogen Pipeline Works and Metering Skids Modification | Linde Malaysia Sdn Bhd |
43 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Enstek FL Stage 2/18, Bandar Enstek, Negeri Sembilan | 132m of 100mm and 829m of 150mm Gas Pipeline Works | Gas Malaysia Berhad |
44 | Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Liquified Petroleum Gas (LPG) Services for Genting Outdoor Theme Park, Genting Highlands, Bentong, Pahang | LPG Gas Piping Installation | Genting Malaysia Berhad & Perunding Sepakat Ingenleur Sdn Bhd |
45 | Relocation 100mm Pipeline for Zone A, Pavilion Kuala Lumpur | Gas Pipeline Relocation Works | GBC Interior & Engineering Works |
46 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Distribution System to Enstek FL Stage 4/18, Bandar Enstek, Negeri Sembilan | Gas Pipeline Relocation Works | Gas Malaysia Berhad |
47 | Engineering, Procurement, Construction and Commissioning (EPCC) of the Natural Gas Distribution System to Teluk Intan FL Stage 1/17, Teluk Intan, Perak | 26km of 300mm Gas Pipeline Works | Gas Malaysia Berhad |
48 | Relocation and Reinstatement of Existing Gas Pipelines at Kampung Baru North Station | Gas Pipeline Relocation Works | Mujur Minat Sdn Bhd |
49 | Mixed C4 Pipeline Installation for BASF Petronas Chemicals Sdn Bhd - BPC Honeydew Project | 3.4km of Mixed C4 Pipeline Installation & Metering and Piping Installation | BASF Petronas Chemicals Sdn Bhd |
50 | Linde Hicom ASU 5 Project: Gaseous Oxygen Underground Pipeline Works | 4km of 250mm Oxygen Gas Pipeline Works | Linde Malaysia Sdn Bhd |
51 | Natural Gas Services Diversion Works for Proposed Mixed Commercial Development on Lot 297, Jalan Raja Chulan and Jalan Conlay, Seksyen 63, Kuala Lumpur | Gas Pipeline Relocation Works | Segar Wangi Sdn Bhd |
52 | Relocation of Existing Gas Malaysia Pipelines and other Associated Works for KL Sentral Station, Kuala Lumpur | Gas Pipeline Relocation Works | MMC Gamuda KVMRT (T) Sdn Bhd |
53 | The Relocation of Existing Gas Pipeline for Menaiktaraf Jalan Ayer Keroh ke Bandar Melaka (Fasa 1: Pembinaan Persimpangan Peringgit dan Persimpangan MITC) | Gas Pipeline Relocation Works | MCC Technique Sdn Bhd |
54 | Relocation of Existing Gas Malaysia Gas Pipeline for Package CA3 & CA4 (CH. 2650 to CH. 9307) for Projek Penswastaan Lebuhraya Bertingkat Damansara - Shah Alam (DASH) | Gas Pipeline Relocation Works | Panzana Enterprise Sdn Bhd |
55 | Supply, Install, Testing & Commissioning of Underground Gaseous Hydrogen Pipeline for Linde at Kawasan Perindustrian Gebeng (Kuantan), Pahang | 3.5km of Hydrogen Pipeline System | Linde Malaysia Sdn Bhd |
56 | Engineering, Procurement, Construction and Commissioning (EPCC) of the Natural Gas Distribution System to Pulau Indah FL Stage 2/17, Pulau Indah Industrial Park, Klang, Selangor | 1,643m of 150mm and 36m of 100mm Gas Pipeline Works | Gas Malaysia Berhad |
57 | Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Liquified Petroleum Gas (LPG) Services for "Genting Premium Outlets", Genting Highlands, Bentong, Pahang | LPG Gas Piping Installation | Genting Malaysia Berhad & MEACS Construction Sdn Bhd |
58 | Relocation of Existing Gas Malaysia Pipelines and other Associated Works for KL Merdeka Station, Kuala Lumpur | Gas Pipeline Relocation Works | MMC Gamuda KVMRT (T) Sdn Bhd |
59 | Engineering, Procurement, Construction and Commissioning (EPCC) of the Natural Gas Distribution System to Tanjung Langsat FL Stage 2/17, Tanjung Langsat Industrial Area, Tanjung Langsat, Johor | 1,126m of 150mm and 188m of 100mm Gas Pipeline Works | Gas Malaysia Berhad |
60 | The Supply, Delivery, Installation, Testing, Commissioning & Maintenance of Liquified Petroleum Gas (LPG) Services for Cable Car Station and Bus Station at "Genting 2", Genting Highlands, Bentong, Pahang | LPG Gas Piping Installation | Genting Malaysia Berhad & Perunding Sepakat Ingenleur Sdn Bhd |
61 | Gas Pipeline Relocation along Jalan Persiaran Bandar Utama, Bandar Utama Damansara, Mukim Sungai Buloh, Daerah Petaling, Selangor Darul Ehsan | Gas Pipeline Relocation Works | Bandar Utama City Sdn Bhd |
62 | The Supply, Delivery, Installation, Testing, Commissioning & Maintenance of Liquified Petroleum Gas (LPG) Services for Malaysian Food Street II, Genting Highlands, Bentong, Pahang | LPG Gas Piping Installation | Genting Malaysia Berhad & Perunding Sepakat Ingenleur Sdn Bhd |
63 | Supply, Install, Testing & Commissioning of Underground Gaseous Hydrogen Pipeline including Flow Metering Fabrication for Kibing at Senawang, Negeri Sembilan | 678m of 65mm Hydrogen Pipeline System | Linde Malaysia Sdn Bhd |
64 | Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Liquified Petroleum Gas (LPG) Services for Malaysia Food Street, Genting Highlands, Bentong, Pahang | LPG Gas Piping Installation | Genting Malaysia Berhad & KTA Tenaga Sdn Bhd |
65 | Engineering, Procurement, Construction and Commissioning (EPCC) of Natural Gas Pipeline Relocation Work at Lot 33878, 33846 & 33845, Hap Seng Land, Lebuhraya Skim Penyuraian Trafik Kajang (SILK), Balakong, Selangor Darul Ehsan | Gas Pipeline Relocation Works | Gas Malaysia Berhad |
66 | Natural Gas Relocation Work for Cadangan Menaiktaraf Jalan Cochrane dari Persimpangan Lampu Isyarat Jalan Tun Razak sehingga Persimpangan Jalan Shelly, Kuala Lumpur | Gas Pipeline Relocation Works | Infra Segi Sdn Bhd |
67 | Supply, Install, Testing & Commissioning of Underground Gaseous Nitrogen Pipeline including Flow Metering Fabrication for IFFCO at Pasir Gudang, Johor | Nitrogen Pipeline Works and Metering Skid Construction | Linde Malaysia Sdn Bhd |
68 | To Supply & Install 450m of 6" Underground PVC Piping at Gebeng Industrial Area - WR Grace Pipeline | 450m of 150mm PVC Piping Works | South Pacific Chemical Industries Sdn Bhd |
69 | Engineering, Procurement, Construction and Commissioning (EPCC) of Nitrogen Underground Pipeline from Prai & Bukit Minyak, Pulau Pinang | 8km of 200mm Nitrogen Pipeline Works | Kelington Technologies Sdn Bhd |
70 | Engineering, Procurement, Construction and Commissioning (EPCC) of Nitrogen Underground Pipeline Package B, Prai, Pulau Pinang | 5km of 200mm Oxygen Pipeline Works | Kelington Technologies Sdn Bhd |